Mark decided that tonight was the night to take the bathtub out of the bathroom. What a chore that was!
First, we rolled the tub over onto its side and then upended it to put it on a refrigerator dolly. Mark tried to take it out the door width-wise but it got stuck. We took it off the dolly and put it back on on the length-wise end and re-strapped it. That worked for getting it through the doors.
We’re almost done with the demolition. Mark told me that he hopes to have the floor redone by the end of this weekend which means we’ll be starting on the reconstruction. I can hardly wait to get over the hump!
Looks like a lot of work! Keep it up; results will be wonderful.